Toshiba Semiconductor and Storage 2SK4037(TE12L,Q)

Toshiba Semiconductor and Storage 2SK4037(TE12L,Q) electronic component

Image shown is a representation only

Manufacturer No
2SK4037(TE12L,Q)
Package
SC-70, SOT-323
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
MOSFET N-CH PW-X
Detailed Description
RF Mosfet 6 V 250 mA 470MHz 11.5dB 36.5dBmW SC-70
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Gain
11.5dB
Frequency
470MHz
Packaging
Tape & Reel (TR); Cut Tape (CT)
Technology
MOSFET (Metal Oxide)
Manufacturer
Toshiba Semiconductor and Storage
Configuration
N-Channel
Current - Test
250 mA
Package / Case
SC-70, SOT-323
Power - Output
36.5dBmW
Voltage - Test
6 V
Voltage - Rated
12 V
Base Product Number
2SK4037
Current Rating (Amps)
3A
Supplier Device Package
SC-70
AttributeValue
Gain11.5dB
Frequency470MHz
PackagingTape & Reel (TR); Cut Tape (CT)
TechnologyMOSFET (Metal Oxide)
ManufacturerToshiba Semiconductor and Storage
ConfigurationN-Channel
Current - Test250 mA
Package / CaseSC-70, SOT-323
Power - Output36.5dBmW
Voltage - Test6 V
Voltage - Rated12 V
Base Product Number2SK4037
Current Rating (Amps)3A
Supplier Device PackageSC-70

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping