SCT SCT52A40DSAR

SCT SCT52A40DSAR electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
SCT52A40DSAR
Package
9-VFDFN Exposed Pad
Packaging
Tape & Reel (TR)
Description
IC GATE DRVR HALF-BRIDGE 9DFN
Detailed Description
Half-Bridge Gate Driver IC Non-Inverting 9-DFN (3x3)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Gate Type
MOSFET (N-Channel)
Packaging
Tape & Reel (TR)
Input Type
Non-Inverting
Channel Type
Independent
Manufacturer
SCT
Mounting Type
Surface Mount
Package / Case
9-VFDFN Exposed Pad
Voltage - Supply
8V ~ 24V
Number of Drivers
2
Driven Configuration
Half-Bridge
Operating Temperature
-40°C ~ 150°C (TJ)
Rise / Fall Time (Typ)
7ns, 4.5ns
Supplier Device Package
9-DFN (3x3)
High Side Voltage - Max (Bootstrap)
120 V
Current - Peak Output (Source, Sink)
4A, 4A
AttributeValue
Gate TypeMOSFET (N-Channel)
PackagingTape & Reel (TR)
Input TypeNon-Inverting
Channel TypeIndependent
ManufacturerSCT
Mounting TypeSurface Mount
Package / Case9-VFDFN Exposed Pad
Voltage - Supply8V ~ 24V
Number of Drivers2
Driven ConfigurationHalf-Bridge
Operating Temperature-40°C ~ 150°C (TJ)
Rise / Fall Time (Typ)7ns, 4.5ns
Supplier Device Package9-DFN (3x3)
High Side Voltage - Max (Bootstrap)120 V
Current - Peak Output (Source, Sink)4A, 4A

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping