HellermannTyton 169-23010

HellermannTyton 169-23010 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
169-23010
Packaging
Bulk
Description
NON-METALLIC TUBING, 10MM DIA, P
Detailed Description
Black Polytetrafluoroethylene (PTFE) Convoluted, Corrugated Wire Loom, Protective Hose 0.380" (9.65mm) 164' (50.00m)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Wire Loom, Protective Hose
Color
Black
Length
164' (50.00m)
Series
CTT
Material
Polytetrafluoroethylene (PTFE)
Packaging
Bulk
Manufacturer
HellermannTyton
Heat Protection
Heat Resistant
Type Attributes
Convoluted, Corrugated
Diameter - Inside
0.380" (9.65mm)
Diameter - Outside
0.526" (13.36mm)
Abrasion Protection
Abrasion Resistant
Operating Temperature
-65°C ~ 260°C
Environment Protection
Corrosion Resistant
AttributeValue
TypeWire Loom, Protective Hose
ColorBlack
Length164' (50.00m)
SeriesCTT
MaterialPolytetrafluoroethylene (PTFE)
PackagingBulk
ManufacturerHellermannTyton
Heat ProtectionHeat Resistant
Type AttributesConvoluted, Corrugated
Diameter - Inside0.380" (9.65mm)
Diameter - Outside0.526" (13.36mm)
Abrasion ProtectionAbrasion Resistant
Operating Temperature-65°C ~ 260°C
Environment ProtectionCorrosion Resistant

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping