HellermannTyton 169-60123

HellermannTyton 169-60123 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
169-60123
Packaging
Box
Description
CONVOLUTEDTUBINGSPLIT,0.5"D
Detailed Description
Orange Polypropylene (PP) Convoluted, Corrugated Wire Loom, Protective Hose 0.516" (13.11mm) 1100' (335.28m)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Wire Loom, Protective Hose
Color
Orange
Length
1100' (335.28m)
Series
CTPPFR
Material
Polypropylene (PP)
Packaging
Box
Spool Size
1100' (335.28m)
Manufacturer
HellermannTyton
Wall Thickness
0.005" (0.13mm)
Heat Protection
Flame Retardant
Type Attributes
Convoluted, Corrugated
Diameter - Inside
0.516" (13.11mm)
Diameter - Outside
0.700" (17.78mm)
Operating Temperature
-40°C ~ 125°C
Material Flammability Rating
UL94 V-2
AttributeValue
TypeWire Loom, Protective Hose
ColorOrange
Length1100' (335.28m)
SeriesCTPPFR
MaterialPolypropylene (PP)
PackagingBox
Spool Size1100' (335.28m)
ManufacturerHellermannTyton
Wall Thickness0.005" (0.13mm)
Heat ProtectionFlame Retardant
Type AttributesConvoluted, Corrugated
Diameter - Inside0.516" (13.11mm)
Diameter - Outside0.700" (17.78mm)
Operating Temperature-40°C ~ 125°C
Material Flammability RatingUL94 V-2

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping