Good-Ark Semiconductor MURB1040CT

Good-Ark Semiconductor MURB1040CT electronic component

Image shown is a representation only

Manufacturer No
MURB1040CT
Package
TO-263-3, D2PAK (2 Leads + Tab), TO-263AB
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
DIODE ARRAY GP 400V 5A TO263
Detailed Description
Diode Array 1 Pair Common Cathode 400 V 5A Surface Mount TO-263-3, D2PAK (2 Leads + Tab), TO-263AB
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Speed
Fast Recovery =< 500ns, > 200mA (Io)
Packaging
Tape & Reel (TR); Cut Tape (CT)
Technology
Standard
Manufacturer
Good-Ark Semiconductor
Mounting Type
Surface Mount
Package / Case
TO-263-3, D2PAK (2 Leads + Tab), TO-263AB
Base Product Number
MURB1040
Diode Configuration
1 Pair Common Cathode
Supplier Device Package
TO-263 (D2PAK)
Reverse Recovery Time (trr)
50 ns
Current - Reverse Leakage @ Vr
10 µA @ 400 V
Voltage - DC Reverse (Vr) (Max)
400 V
Operating Temperature - Junction
-55°C ~ 150°C
Voltage - Forward (Vf) (Max) @ If
1.3 V @ 5 A
Current - Average Rectified (Io) (per Diode)
5A
AttributeValue
SpeedFast Recovery =< 500ns, > 200mA (Io)
PackagingTape & Reel (TR); Cut Tape (CT)
TechnologyStandard
ManufacturerGood-Ark Semiconductor
Mounting TypeSurface Mount
Package / CaseTO-263-3, D2PAK (2 Leads + Tab), TO-263AB
Base Product NumberMURB1040
Diode Configuration1 Pair Common Cathode
Supplier Device PackageTO-263 (D2PAK)
Reverse Recovery Time (trr)50 ns
Current - Reverse Leakage @ Vr10 µA @ 400 V
Voltage - DC Reverse (Vr) (Max)400 V
Operating Temperature - Junction-55°C ~ 150°C
Voltage - Forward (Vf) (Max) @ If1.3 V @ 5 A
Current - Average Rectified (Io) (per Diode)5A

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping