Good-Ark Semiconductor MBR3045CT

Good-Ark Semiconductor MBR3045CT electronic component

Image shown is a representation only

Manufacturer No
MBR3045CT
Package
TO-220-3
Packaging
Tube
Description
DIODE ARR SCHOT 45V 30MA TO220AB
Detailed Description
Diode Array 1 Pair Common Cathode 45 V 30mA Through Hole TO-220-3
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Speed
Small Signal =< 200mA (Io), Any Speed
Packaging
Tube
Technology
Schottky
Manufacturer
Good-Ark Semiconductor
Mounting Type
Through Hole
Package / Case
TO-220-3
Base Product Number
MBR3045
Diode Configuration
1 Pair Common Cathode
Supplier Device Package
TO-220AB
Current - Reverse Leakage @ Vr
200 nA @ 45 V
Voltage - DC Reverse (Vr) (Max)
45 V
Current - Average Rectified (Io) (per Diode)
30mA
AttributeValue
SpeedSmall Signal =< 200mA (Io), Any Speed
PackagingTube
TechnologySchottky
ManufacturerGood-Ark Semiconductor
Mounting TypeThrough Hole
Package / CaseTO-220-3
Base Product NumberMBR3045
Diode Configuration1 Pair Common Cathode
Supplier Device PackageTO-220AB
Current - Reverse Leakage @ Vr200 nA @ 45 V
Voltage - DC Reverse (Vr) (Max)45 V
Current - Average Rectified (Io) (per Diode)30mA

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping