Diodes Incorporated GBJ2508

Diodes Incorporated GBJ2508 electronic component

Image shown is a representation only

Manufacturer No
GBJ2508
Date Code
23+
Quantity
2,520
Availability
In Stock
Description
Bridge Rectifier, Standard. If - 25A, Ifsm - 350A, IR - 10uA, VF - 1.05V
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mount
Through Hole
Width
4.8 mm
Height
24.5 mm
Length
30.3 mm
Number of Pins
4
Forward Current
25 A
Forward Voltage
1.05 V
Max Surge Current
350 A
Max Output Current
4.2 A
Number of Elements
1
Number of Terminals
4
Peak Reverse Current
10 µA
Min Breakdown Voltage
800 V
Reverse Standoff Voltage
800 V
Max Operating Temperature
150 °C
Min Operating Temperature
-55 °C
Max Reverse Leakage Current
10 µA
Max Forward Surge Current (Ifsm)
350 A
Peak Non-Repetitive Surge Current
350 A
Max Repetitive Reverse Voltage (Vrrm)
800 V
AttributeValue
MountThrough Hole
Width4.8 mm
Height24.5 mm
Length30.3 mm
Number of Pins4
Forward Current25 A
Forward Voltage1.05 V
Max Surge Current350 A
Max Output Current4.2 A
Number of Elements1
Number of Terminals4
Peak Reverse Current10 µA
Min Breakdown Voltage800 V
Reverse Standoff Voltage800 V
Max Operating Temperature150 °C
Min Operating Temperature-55 °C
Max Reverse Leakage Current10 µA
Max Forward Surge Current (Ifsm)350 A
Peak Non-Repetitive Surge Current350 A
Max Repetitive Reverse Voltage (Vrrm)800 V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping