WeEn Semiconductors P4SOD85CAX

WeEn Semiconductors P4SOD85CAX electronic component

Image shown is a representation only

Manufacturer No
P4SOD85CAX
Package
SOD-123F
Packaging
Tape & Reel (TR)
Description
TVS DIODE 85VWM 137VC SOD123
Detailed Description
137V Clamp 2.9A Ipp Tvs Diode Surface Mount SOD-123
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
WeEn Semiconductors
Type
Zener
Series
P4SOD
Packaging
Tape & Reel (TR)
Applications
General Purpose
Mounting Type
Surface Mount
Package / Case
SOD-123F
Power - Peak Pulse
400W
Base Product Number
P4SOD85
Operating Temperature
-65°C ~ 150°C (TJ)
Power Line Protection
No
Bidirectional Channels
1
Supplier Device Package
SOD-123
Voltage - Breakdown (Min)
94.4V
Voltage - Clamping (Max) @ Ipp
137V
Voltage - Reverse Standoff (Typ)
85V
Current - Peak Pulse (10/1000µs)
2.9A
AttributeValue
MfrWeEn Semiconductors
TypeZener
SeriesP4SOD
PackagingTape & Reel (TR)
ApplicationsGeneral Purpose
Mounting TypeSurface Mount
Package / CaseSOD-123F
Power - Peak Pulse400W
Base Product NumberP4SOD85
Operating Temperature-65°C ~ 150°C (TJ)
Power Line ProtectionNo
Bidirectional Channels1
Supplier Device PackageSOD-123
Voltage - Breakdown (Min)94.4V
Voltage - Clamping (Max) @ Ipp137V
Voltage - Reverse Standoff (Typ)85V
Current - Peak Pulse (10/1000µs)2.9A

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping