WAGO Corporation 873-902/VE00-0500

WAGO Corporation 873-902/VE00-0500 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
873-902/VE00-0500
Packaging
Bag
Description
PUSHWIRE SPLICE 2POS YELLOW 500
Detailed Description
SSL Connector 2 Position Receptacle, Push-In Board to Cable/Wire Push In
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Style
Board to Cable/Wire
Series
873
Packaging
Bag
Wire Gauge
12-18 AWG
Termination
Push In
Manufacturer
WAGO Corporation
Housing Color
Yellow
Mounting Type
Panel Mount
Connector Type
Receptacle, Push-In
Voltage Rating
600V
Contact Material
Copper
Base Product Number
873-902/V
Number of Positions
2
Current Rating (Amps)
6A
Operating Temperature
105°C
AttributeValue
StyleBoard to Cable/Wire
Series873
PackagingBag
Wire Gauge12-18 AWG
TerminationPush In
ManufacturerWAGO Corporation
Housing ColorYellow
Mounting TypePanel Mount
Connector TypeReceptacle, Push-In
Voltage Rating600V
Contact MaterialCopper
Base Product Number873-902/V
Number of Positions2
Current Rating (Amps)6A
Operating Temperature105°C

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping