Toshiba Semiconductor and Storage RN1427TE85LF

Toshiba Semiconductor and Storage RN1427TE85LF electronic component

Image shown is a representation only

Manufacturer No
RN1427TE85LF
Package
TO-236-3, SC-59, SOT-23-3
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
TRANS PREBIAS NPN 50V 0.8A SMINI
Detailed Description
Pre-Biased Bipolar Transistor (BJT) NPN - Pre-Biased 50 V 800 mA 300 MHz 200 mW Surface Mount S-Mini
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Packaging
Tape & Reel (TR); Cut Tape (CT)
Power - Max
200 mW
Manufacturer
Toshiba Semiconductor and Storage
Mounting Type
Surface Mount
Package / Case
TO-236-3, SC-59, SOT-23-3
Transistor Type
NPN - Pre-Biased
Resistors Included
R1 and R2
Base Product Number
RN1427
Resistor - Base (R1)
2.2 kOhms
Frequency - Transition
300 MHz
Supplier Device Package
S-Mini
Resistor - Emitter Base (R2)
10 kOhms
Vce Saturation (Max) @ Ib, Ic
250mV @ 1mA, 50mA
Current - Collector (Ic) (Max)
800 mA
Current - Collector Cutoff (Max)
500nA
DC Current Gain (hFE) (Min) @ Ic, Vce
90 @ 100mA, 1V
Voltage - Collector Emitter Breakdown (Max)
50 V
AttributeValue
PackagingTape & Reel (TR); Cut Tape (CT)
Power - Max200 mW
ManufacturerToshiba Semiconductor and Storage
Mounting TypeSurface Mount
Package / CaseTO-236-3, SC-59, SOT-23-3
Transistor TypeNPN - Pre-Biased
Resistors IncludedR1 and R2
Base Product NumberRN1427
Resistor - Base (R1)2.2 kOhms
Frequency - Transition300 MHz
Supplier Device PackageS-Mini
Resistor - Emitter Base (R2)10 kOhms
Vce Saturation (Max) @ Ib, Ic250mV @ 1mA, 50mA
Current - Collector (Ic) (Max)800 mA
Current - Collector Cutoff (Max)500nA
DC Current Gain (hFE) (Min) @ Ic, Vce90 @ 100mA, 1V
Voltage - Collector Emitter Breakdown (Max)50 V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping