TE Connectivity 1925220-9

TE Connectivity 1925220-9 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
1925220-9
Description
Cable Assembly Lead 30AWG D-Subminiature 51 POS PL
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
PPAP
No
Type
D-Sub
Gender
PL
EU RoHS
Compliant
Mounting
Cable Mount
ECCN (US)
9A515.y.6
Automotive
No
Availability
No Stock Available
Number of Rows
2
Number of Ports
1
Body Orientation
Straight
Number of Contacts
51
Termination Method
Solder Bucket
Number of Terminals
51
Terminal Pitch (mm)
0.635
Manufacturer Lead Time
17 weeks
Maximum Current Rating (A)
1/Contact
Maximum Operating Temperature (°C)
125
Minimum Operating Temperature (°C)
-65
AttributeValue
PPAPNo
TypeD-Sub
GenderPL
EU RoHSCompliant
MountingCable Mount
ECCN (US)9A515.y.6
AutomotiveNo
AvailabilityNo Stock Available
Number of Rows2
Number of Ports1
Body OrientationStraight
Number of Contacts51
Termination MethodSolder Bucket
Number of Terminals51
Terminal Pitch (mm)0.635
Manufacturer Lead Time17 weeks
Maximum Current Rating (A)1/Contact
Maximum Operating Temperature (°C)125
Minimum Operating Temperature (°C)-65

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping