TE Connectivity 1218232-1

TE Connectivity 1218232-1 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
1218232-1
Packaging
Individual
Description
Conn D-Sub PIN 15 POS Crimp ST Cable Mount 15 Terminal 1 Port Individual
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
PPAP
No
Type
D-Sub
Gender
PL
EU RoHS
Compliant
Mounting
Cable Mount
ECCN (US)
EAR99
Packaging
Individual
Automotive
No
Shell Size
1
Availability
In Stock
Less Contact
Yes
Shell Plating
Gold Over Electroless Nickel
Contact Gender
PIN
Number of Rows
3
Shell Material
Aluminum Alloy
Number of Ports
1
Body Orientation
Straight
Contact Material
Copper Alloy
Number of Contacts
15
Product Depth (mm)
16.25
Termination Method
Crimp
Number of Terminals
15
Product Height (mm)
12.55
Product Length (mm)
30.81
AttributeValue
PPAPNo
TypeD-Sub
GenderPL
EU RoHSCompliant
MountingCable Mount
ECCN (US)EAR99
PackagingIndividual
AutomotiveNo
Shell Size1
AvailabilityIn Stock
Less ContactYes
Shell PlatingGold Over Electroless Nickel
Contact GenderPIN
Number of Rows3
Shell MaterialAluminum Alloy
Number of Ports1
Body OrientationStraight
Contact MaterialCopper Alloy
Number of Contacts15
Product Depth (mm)16.25
Termination MethodCrimp
Number of Terminals15
Product Height (mm)12.55
Product Length (mm)30.81

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping