TE Connectivity Raychem Cable Protection CP9437-000

TE Connectivity Raychem Cable Protection CP9437-000 electronic component

Image shown is a representation only

Manufacturer No
CP9437-000
Packaging
Spool
Description
LABEL HEAT SHRINKABLE 0.75"D BRN
Detailed Description
Brown Heat Shrinkable Label 0.75" (19.05mm); Cable O.D. 0.275" ~ 0.640" (6.99mm ~ 16.25mm)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Color
Brown
Series
TTMS
Material
Polyolefin (PO), Flame Retardant, Irradiated
Packaging
Spool
Label Size
0.75" (19.05mm); Cable O.D. 0.275" ~ 0.640" (6.99mm ~ 16.25mm)
Label Type
Heat Shrinkable
Shelf Life
144 Months
Manufacturer
TE Connectivity Raychem Cable Protection
Shelf Life Start
Date of Manufacture
Base Product Number
CP94
Operating Temperature
-55°C ~ 135°C
For Use With/Related Products
T2000CT or T6112DS Thermal Transfer Printers
AttributeValue
ColorBrown
SeriesTTMS
MaterialPolyolefin (PO), Flame Retardant, Irradiated
PackagingSpool
Label Size0.75" (19.05mm); Cable O.D. 0.275" ~ 0.640" (6.99mm ~ 16.25mm)
Label TypeHeat Shrinkable
Shelf Life144 Months
ManufacturerTE Connectivity Raychem Cable Protection
Shelf Life StartDate of Manufacture
Base Product NumberCP94
Operating Temperature-55°C ~ 135°C
For Use With/Related ProductsT2000CT or T6112DS Thermal Transfer Printers

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping