TE Connectivity AMP Connectors TFE-28-X-SP

TE Connectivity AMP Connectors TFE-28-X-SP electronic component

Image shown is a representation only

Manufacturer No
TFE-28-X-SP
Packaging
Tape & Reel (TR)
Description
TFE-28-X-SP
Detailed Description
Heat Shrink Tubing, Flexible 0.035" (0.89mm) 1.8 to 1 Clear
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
TE Connectivity AMP Connectors
Type
Tubing, Flexible
Color
Clear
Series
TFE
Features
Abrasion Resistant, Corrosion Resistant, Flame Retardant
Material
Polytetrafluoroethylene (PTFE)
Packaging
Tape & Reel (TR)
Shelf Life
48 Months
Shrinkage Ratio
1.8 to 1
Shrink Temperature
330°C
Operating Temperature
-67°C ~ 250°C
Recovered Wall Thickness
0.009" (0.23mm)
Inner Diameter - Supplied
0.035" (0.89mm)
Inner Diameter - Recovered
0.018" (0.45mm)
AttributeValue
MfrTE Connectivity AMP Connectors
TypeTubing, Flexible
ColorClear
SeriesTFE
FeaturesAbrasion Resistant, Corrosion Resistant, Flame Retardant
MaterialPolytetrafluoroethylene (PTFE)
PackagingTape & Reel (TR)
Shelf Life48 Months
Shrinkage Ratio1.8 to 1
Shrink Temperature330°C
Operating Temperature-67°C ~ 250°C
Recovered Wall Thickness0.009" (0.23mm)
Inner Diameter - Supplied0.035" (0.89mm)
Inner Diameter - Recovered0.018" (0.45mm)

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping