Tamura 4DUD51016CFN1

Tamura 4DUD51016CFN1 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
4DUD51016CFN1
Package
Module
Packaging
Tray
Description
IC GATE DRVR HALF-BRIDGE MODULE
Detailed Description
Half-Bridge Gate Driver IC Non-Inverting Module
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Gate Type
IGBT
Packaging
Tray
Input Type
Non-Inverting
Channel Type
Synchronous
Manufacturer
Tamura
Mounting Type
Chassis Mount
Package / Case
Module
Voltage - Supply
13V ~ 28V
Number of Drivers
4
Base Product Number
4DUC51016
DigiKey Programmable
Not Verified
Driven Configuration
Half-Bridge
Operating Temperature
-40°C ~ 85°C (TA)
Supplier Device Package
Module
High Side Voltage - Max (Bootstrap)
1200 V
AttributeValue
Gate TypeIGBT
PackagingTray
Input TypeNon-Inverting
Channel TypeSynchronous
ManufacturerTamura
Mounting TypeChassis Mount
Package / CaseModule
Voltage - Supply13V ~ 28V
Number of Drivers4
Base Product Number4DUC51016
DigiKey ProgrammableNot Verified
Driven ConfigurationHalf-Bridge
Operating Temperature-40°C ~ 85°C (TA)
Supplier Device PackageModule
High Side Voltage - Max (Bootstrap)1200 V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping