Standex-Meder Electronics M12-HS1-5KCB2

Standex-Meder Electronics M12-HS1-5KCB2 electronic component

Image shown is a representation only

Manufacturer No
M12-HS1-5KCB2
Packaging
Bulk
Description
Hall Effect Sensor 60mA 3.3V/5V/9V/12V/15V/18V 4-Pin Bulk
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
9031.80.80.85
PPAP
Unknown
EU RoHS
Compliant
Mounting
Panel
ECCN (US)
EAR99
Packaging
Bulk
Pin Count
4
Automotive
Yes
PCB changed
4
Availability
In Stock
Package Width
19.62
Package Height
17
Package Length
35.4
Manufacturer Lead Time
12 weeks
Module/IC Classification
Module
Maximum Output Current (mA)
60
Maximum Supply Current (uA)
7000
Maximum Operating Temperature (°C)
150
Minimum Operating Temperature (°C)
-40
Maximum Operating Supply Voltage (V)
24
Minimum Operating Supply Voltage (V)
3
Typical Operating Supply Voltage (V)
3.3|5|9|12|15|18
Typical Magnetic Sensor Hysteresis (Gs)
20
Minimum Magnetic Sensor Release Point (Gs)
5
Maximum Magnetic Sensor Operating Point (Gs)
76
AttributeValue
HTS9031.80.80.85
PPAPUnknown
EU RoHSCompliant
MountingPanel
ECCN (US)EAR99
PackagingBulk
Pin Count4
AutomotiveYes
PCB changed4
AvailabilityIn Stock
Package Width19.62
Package Height17
Package Length35.4
Manufacturer Lead Time12 weeks
Module/IC ClassificationModule
Maximum Output Current (mA)60
Maximum Supply Current (uA)7000
Maximum Operating Temperature (°C)150
Minimum Operating Temperature (°C)-40
Maximum Operating Supply Voltage (V)24
Minimum Operating Supply Voltage (V)3
Typical Operating Supply Voltage (V)3.3|5|9|12|15|18
Typical Magnetic Sensor Hysteresis (Gs)20
Minimum Magnetic Sensor Release Point (Gs)5
Maximum Magnetic Sensor Operating Point (Gs)76

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping