Souriau-Sunbank by Eaton UTG10ST

Souriau-Sunbank by Eaton UTG10ST electronic component

Image shown is a representation only

Manufacturer No
UTG10ST
Packaging
Bulk
Description
CONN BACKSH W/CLMP SZ10 BLK PG9
Detailed Description
Black Connector Backshell, Cable Clamp PG9 10
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Backshell, Cable Clamp
Color
Black
Series
Trim Trio®
Material
Thermoplastic
Packaging
Bulk
Cable Exit
180°
Thread Size
PG9
Manufacturer
Souriau-Sunbank by Eaton
Cable Opening
0.079" ~ 0.236" (2.00mm ~ 6.00mm)
Diameter - Outside
0.827" (21.00mm)
Ingress Protection
IP65 - Dust Tight, Water Resistant
Base Product Number
UTG10
Shell Size - Insert
10
For Use With/Related Products
Trim Trio® UTG and UTP Connectors
AttributeValue
TypeBackshell, Cable Clamp
ColorBlack
SeriesTrim Trio®
MaterialThermoplastic
PackagingBulk
Cable Exit180°
Thread SizePG9
ManufacturerSouriau-Sunbank by Eaton
Cable Opening0.079" ~ 0.236" (2.00mm ~ 6.00mm)
Diameter - Outside0.827" (21.00mm)
Ingress ProtectionIP65 - Dust Tight, Water Resistant
Base Product NumberUTG10
Shell Size - Insert10
For Use With/Related ProductsTrim Trio® UTG and UTP Connectors

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping