Skyworks Solutions Inc. SI3404-A-GMR

Skyworks Solutions Inc. SI3404-A-GMR electronic component

Image shown is a representation only

Manufacturer No
SI3404-A-GMR
Date Code
21+
Quantity
2,000
Availability
In Stock
Package
20-VFQFN Exposed Pad
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
IC POE CNTRL 1 CHANNEL 20QFN
Detailed Description
Power Over Ethernet Controller 1 Channel 802.3at (PoE) 20-QFN (4x4)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Controller (PD), DC/DC
Packaging
Tape & Reel (TR); Cut Tape (CT)
Standards
802.3at (PoE)
Power - Max
15.4 W
Manufacturer
Skyworks Solutions Inc.
Mounting Type
Surface Mount
Package / Case
20-VFQFN Exposed Pad
Auxiliary Sense
Yes
Voltage - Supply
1.5V ~ 57V
Internal Switch(s)
Yes
Number of Channels
1
Base Product Number
SI3404
Operating Temperature
-40°C ~ 85°C
Supplier Device Package
20-QFN (4x4)
AttributeValue
TypeController (PD), DC/DC
PackagingTape & Reel (TR); Cut Tape (CT)
Standards802.3at (PoE)
Power - Max15.4 W
ManufacturerSkyworks Solutions Inc.
Mounting TypeSurface Mount
Package / Case20-VFQFN Exposed Pad
Auxiliary SenseYes
Voltage - Supply1.5V ~ 57V
Internal Switch(s)Yes
Number of Channels1
Base Product NumberSI3404
Operating Temperature-40°C ~ 85°C
Supplier Device Package20-QFN (4x4)

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping