Shindengen Electric Manufacturing Co., Ltd PT200KN8

Shindengen Electric Manufacturing Co., Ltd PT200KN8 electronic component

Image shown is a representation only

Manufacturer No
PT200KN8
Description
Diode Rectifier Bridge Single 800V 200A 5-Pin
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
PPAP
No
EU RoHS
Compliant
Mounting
Screw
Pin Count
5
Automotive
No
Bridge Type
Three Phase
PCB changed
5
Availability
In Stock
Configuration
Single
Package Width
52
Package Length
91
Manufacturer Lead Time
6 weeks
Peak Reverse Current (uA)
7000
Maximum Forward Voltage (V)
1.4
Peak Average Forward Current (A)
200
Maximum Operating Temperature (°C)
150
Minimum Operating Temperature (°C)
-40
Peak Reverse Repetitive Voltage (V)
800
Peak Non-Repetitive Forward Surge Current (A)
2000
AttributeValue
PPAPNo
EU RoHSCompliant
MountingScrew
Pin Count5
AutomotiveNo
Bridge TypeThree Phase
PCB changed5
AvailabilityIn Stock
ConfigurationSingle
Package Width52
Package Length91
Manufacturer Lead Time6 weeks
Peak Reverse Current (uA)7000
Maximum Forward Voltage (V)1.4
Peak Average Forward Current (A)200
Maximum Operating Temperature (°C)150
Minimum Operating Temperature (°C)-40
Peak Reverse Repetitive Voltage (V)800
Peak Non-Repetitive Forward Surge Current (A)2000

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping