Semitec USA Corp S-101T

Semitec USA Corp S-101T electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
S-101T
Package
2-SMD, Flat Leads
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
DIODE CUR REG 100V 210UA 500MW
Detailed Description
Current Regulation Diode 100V 210µA 500mW 2-SMD, Flat Leads
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Series
S
Packaging
Tape & Reel (TR); Cut Tape (CT)
Power - Max
500mW
Applications
Battery Charger
Manufacturer
Semitec USA Corp
Mounting Type
Surface Mount
Package / Case
2-SMD, Flat Leads
Base Product Number
S-101
Operating Temperature
-40°C ~ 150°C
Regulator Current (Max)
210µA
Supplier Device Package
2-SMD
Voltage - Limiting (Max)
500mV
Voltage - Anode - Cathode (Vak)(Max)
100V
AttributeValue
SeriesS
PackagingTape & Reel (TR); Cut Tape (CT)
Power - Max500mW
ApplicationsBattery Charger
ManufacturerSemitec USA Corp
Mounting TypeSurface Mount
Package / Case2-SMD, Flat Leads
Base Product NumberS-101
Operating Temperature-40°C ~ 150°C
Regulator Current (Max)210µA
Supplier Device Package2-SMD
Voltage - Limiting (Max)500mV
Voltage - Anode - Cathode (Vak)(Max)100V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping