SCHURTER Inc. 3-137-754

SCHURTER Inc. 3-137-754 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
3-137-754
Packaging
Box
Description
6080 CONNECTOR INLET 10A C18
Detailed Description
Power Connector Receptacle, Male Pins Panel Mount, Flange
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Packaging
Box
Termination
Solder Eyelet
Manufacturer
SCHURTER Inc.
Mounting Type
Panel Mount, Flange
Connector Type
Receptacle, Male Pins
Voltage Rating
250VAC
Approval Agency
CCC, cURus, ENEC
Ingress Protection
IP20
Number of Positions
2
Current Rating (Amps)
15A
Panel Cutout Dimensions
Rectangular - 29.50mm x 24.00mm
Material Flammability Rating
UL94 V-0
AttributeValue
PackagingBox
TerminationSolder Eyelet
ManufacturerSCHURTER Inc.
Mounting TypePanel Mount, Flange
Connector TypeReceptacle, Male Pins
Voltage Rating250VAC
Approval AgencyCCC, cURus, ENEC
Ingress ProtectionIP20
Number of Positions2
Current Rating (Amps)15A
Panel Cutout DimensionsRectangular - 29.50mm x 24.00mm
Material Flammability RatingUL94 V-0

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping