ROHM Semiconductor RSB12JS2T2R

ROHM Semiconductor RSB12JS2T2R electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
RSB12JS2T2R
Quantity
3,870
Availability
In Stock
Package
SOT-563, SOT-666
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
TVS DIODE 9VWM EMD6
Detailed Description
Clamp Ipp Tvs Diode Surface Mount EMD6
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
Rohm Semiconductor
Type
Zener
Packaging
Tape & Reel (TR); Cut Tape (CT)
Applications
General Purpose
Mounting Type
Surface Mount
Package / Case
SOT-563, SOT-666
Base Product Number
RSB12
Power Line Protection
No
Bidirectional Channels
2
Supplier Device Package
EMD6
Voltage - Breakdown (Min)
9.6V
Voltage - Reverse Standoff (Typ)
9V
AttributeValue
MfrRohm Semiconductor
TypeZener
PackagingTape & Reel (TR); Cut Tape (CT)
ApplicationsGeneral Purpose
Mounting TypeSurface Mount
Package / CaseSOT-563, SOT-666
Base Product NumberRSB12
Power Line ProtectionNo
Bidirectional Channels2
Supplier Device PackageEMD6
Voltage - Breakdown (Min)9.6V
Voltage - Reverse Standoff (Typ)9V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping