ROHM Semiconductor RB168MM-40TR

ROHM Semiconductor RB168MM-40TR electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
RB168MM-40TR
Quantity
61,875
Availability
In Stock
Package
SOD-123F
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
DIODE SCHOTTKY 40V 1A PMDU
Detailed Description
Diode 40 V 1A Surface Mount PMDU
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
Rohm Semiconductor
Speed
Fast Recovery =< 500ns, > 200mA (Io)
Packaging
Tape & Reel (TR); Cut Tape (CT)
Technology
Schottky
Mounting Type
Surface Mount
Package / Case
SOD-123F
Base Product Number
RB168
Supplier Device Package
PMDU
Current - Reverse Leakage @ Vr
550 nA @ 40 V
Voltage - DC Reverse (Vr) (Max)
40 V
Current - Average Rectified (Io)
1A
Operating Temperature - Junction
175°C (Max)
Voltage - Forward (Vf) (Max) @ If
650 mV @ 1 A
AttributeValue
MfrRohm Semiconductor
SpeedFast Recovery =< 500ns, > 200mA (Io)
PackagingTape & Reel (TR); Cut Tape (CT)
TechnologySchottky
Mounting TypeSurface Mount
Package / CaseSOD-123F
Base Product NumberRB168
Supplier Device PackagePMDU
Current - Reverse Leakage @ Vr550 nA @ 40 V
Voltage - DC Reverse (Vr) (Max)40 V
Current - Average Rectified (Io)1A
Operating Temperature - Junction175°C (Max)
Voltage - Forward (Vf) (Max) @ If650 mV @ 1 A

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping