ROHM Semiconductor EDZVT2R4.7B

ROHM Semiconductor EDZVT2R4.7B electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
EDZVT2R4.7B
Quantity
16,580
Availability
In Stock
Package
SC-79, SOD-523
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
DIODE ZENER 4.7V 150MW EMD2
Detailed Description
Zener Diode 4.7 V 150 mW ±2% Surface Mount EMD2
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
Rohm Semiconductor
Series
EDZV
Packaging
Tape & Reel (TR); Cut Tape (CT)
Tolerance
±2%
Power - Max
150 mW
Mounting Type
Surface Mount
Package / Case
SC-79, SOD-523
Base Product Number
EDZVT2
Impedance (Max) (Zzt)
100 Ohms
Operating Temperature
-55°C ~ 150°C
Supplier Device Package
EMD2
Voltage - Zener (Nom) (Vz)
4.7 V
Current - Reverse Leakage @ Vr
2 µA @ 1 V
AttributeValue
MfrRohm Semiconductor
SeriesEDZV
PackagingTape & Reel (TR); Cut Tape (CT)
Tolerance±2%
Power - Max150 mW
Mounting TypeSurface Mount
Package / CaseSC-79, SOD-523
Base Product NumberEDZVT2
Impedance (Max) (Zzt)100 Ohms
Operating Temperature-55°C ~ 150°C
Supplier Device PackageEMD2
Voltage - Zener (Nom) (Vz)4.7 V
Current - Reverse Leakage @ Vr2 µA @ 1 V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping