ROHM Semiconductor BM2SC122FP2-LBZE2

ROHM Semiconductor BM2SC122FP2-LBZE2 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
BM2SC122FP2-LBZE2
Package
TO-263
Packaging
Tape and Reel
Description
AC to DC Switching Converter Flyback 20V 134kHz T/R 8-Pin(7+Tab) TO-263
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Tab
Tab
PPAP
No
EU RoHS
Compliant
Mounting
Surface Mount
Topology
Flyback
ECCN (US)
EAR99
Packaging
Tape and Reel
Pin Count
8
Automotive
No
PCB changed
7
Availability
In Stock
Package Width
9.08
Package Height
4.43
Package Length
10.18
Supplier Package
TO-263
Soft Start Option
Yes
Standard Package Name
TO
Manufacturer Lead Time
9 weeks
Maximum Supply Voltage (V)
27.5
Minimum Supply Voltage (V)
15
Maximum Supply Current (mA)
1.3
Maximum Switching Frequency (kHz)
134
Maximum Under Voltage Lock Out (V)
20
Minimum Under Voltage Lock Out (V)
19
Typical Under Voltage Lock Out (V)
19.5
Maximum Operating Temperature (°C)
105
Minimum Operating Temperature (°C)
-40
AttributeValue
TabTab
PPAPNo
EU RoHSCompliant
MountingSurface Mount
TopologyFlyback
ECCN (US)EAR99
PackagingTape and Reel
Pin Count8
AutomotiveNo
PCB changed7
AvailabilityIn Stock
Package Width9.08
Package Height4.43
Package Length10.18
Supplier PackageTO-263
Soft Start OptionYes
Standard Package NameTO
Manufacturer Lead Time9 weeks
Maximum Supply Voltage (V)27.5
Minimum Supply Voltage (V)15
Maximum Supply Current (mA)1.3
Maximum Switching Frequency (kHz)134
Maximum Under Voltage Lock Out (V)20
Minimum Under Voltage Lock Out (V)19
Typical Under Voltage Lock Out (V)19.5
Maximum Operating Temperature (°C)105
Minimum Operating Temperature (°C)-40

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping