Renesas Electronics Corporation US082-13-DA7280EVZ

Renesas Electronics Corporation US082-13-DA7280EVZ electronic component

Image shown is a representation only

Manufacturer No
US082-13-DA7280EVZ
Packaging
Box
Description
PMOD BOARD DA7280
Detailed Description
DA7280 Motor Controller/Driver, Haptic/Vibration Power Management Pmod™ Platform Evaluation Expansion Board
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Power Management
Contents
Board(s)
Function
Motor Controller/Driver, Haptic/Vibration
Platform
Pmod™
Packaging
Box
Manufacturer
Renesas Electronics Corporation
Primary Attributes
Motors (Haptic, Vibration)
Utilized IC / Part
DA7280
Base Product Number
DA7280
Interconnect System
Pmod
Secondary Attributes
I2C Interface(s)
AttributeValue
TypePower Management
ContentsBoard(s)
FunctionMotor Controller/Driver, Haptic/Vibration
PlatformPmod™
PackagingBox
ManufacturerRenesas Electronics Corporation
Primary AttributesMotors (Haptic, Vibration)
Utilized IC / PartDA7280
Base Product NumberDA7280
Interconnect SystemPmod
Secondary AttributesI2C Interface(s)

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping