Renesas Electronics Corporation RJU4352TDPP-EJ#T2

Renesas Electronics Corporation RJU4352TDPP-EJ#T2 electronic component

Image shown is a representation only

Manufacturer No
RJU4352TDPP-EJ#T2
Package
TO-220-2 Full Pack
Packaging
Tube
Description
DIODE STD 430V 20A TO220FP2L
Detailed Description
Diode 430 V 20A Through Hole TO-220FP-2L
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
Renesas Electronics Corporation
Speed
Fast Recovery =< 500ns, > 200mA (Io)
Packaging
Tube
Technology
Standard
Mounting Type
Through Hole
Package / Case
TO-220-2 Full Pack
Supplier Device Package
TO-220FP-2L
Reverse Recovery Time (trr)
25 ns
Current - Reverse Leakage @ Vr
1 µA @ 430 V
Voltage - DC Reverse (Vr) (Max)
430 V
Current - Average Rectified (Io)
20A
Operating Temperature - Junction
-55°C ~ 150°C
Voltage - Forward (Vf) (Max) @ If
1.8 V @ 20 A
AttributeValue
MfrRenesas Electronics Corporation
SpeedFast Recovery =< 500ns, > 200mA (Io)
PackagingTube
TechnologyStandard
Mounting TypeThrough Hole
Package / CaseTO-220-2 Full Pack
Supplier Device PackageTO-220FP-2L
Reverse Recovery Time (trr)25 ns
Current - Reverse Leakage @ Vr1 µA @ 430 V
Voltage - DC Reverse (Vr) (Max)430 V
Current - Average Rectified (Io)20A
Operating Temperature - Junction-55°C ~ 150°C
Voltage - Forward (Vf) (Max) @ If1.8 V @ 20 A

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping