Qualcomm (RF front-end (RFFE) filters) B39202B8047P810

Qualcomm (RF front-end (RFFE) filters) B39202B8047P810 electronic component

Image shown is a representation only

Manufacturer No
B39202B8047P810
Package
SMD
Description
RF Duplexer 48dB at 1930.42MHz to 1989.76MHz 47dB at 1850.24MHz to 1909.76MHz 9-Pin SMD T/R
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
8529.90.22.00
PPAP
No
EU RoHS
Compliant
Mounting
Surface Mount
ECCN (US)
5A991g.
Pin Count
9
Automotive
No
PCB changed
9
Availability
No Stock Available
Package Width
2
Package Height
0.5(Max)
Package Length
2.5
Supplier Package
SMD
Receiver Band (MHz)
1850.24 to 1909.76
Manufacturer Lead Time
16 weeks
Transmitter Band (MHz)
1930.42 to 1989.76
Typical Receiver Ripple (dB)
1
Typical Transmitter Ripple (dB)
0.9
Maximum Operating Temperature (°C)
95
Minimum Operating Temperature (°C)
-40
Minimum Antenna to Receiver Attenuation (dB)
45
Minimum Transmitter to Antenna Attenuation (dB)
45
Minimum Transmitter to Receiver Isolation @ Receiver Band (dB)
47
Minimum Transmitter to Receiver Isolation @ Transmitter Band (dB)
48
AttributeValue
HTS8529.90.22.00
PPAPNo
EU RoHSCompliant
MountingSurface Mount
ECCN (US)5A991g.
Pin Count9
AutomotiveNo
PCB changed9
AvailabilityNo Stock Available
Package Width2
Package Height0.5(Max)
Package Length2.5
Supplier PackageSMD
Receiver Band (MHz)1850.24 to 1909.76
Manufacturer Lead Time16 weeks
Transmitter Band (MHz)1930.42 to 1989.76
Typical Receiver Ripple (dB)1
Typical Transmitter Ripple (dB)0.9
Maximum Operating Temperature (°C)95
Minimum Operating Temperature (°C)-40
Minimum Antenna to Receiver Attenuation (dB)45
Minimum Transmitter to Antenna Attenuation (dB)45
Minimum Transmitter to Receiver Isolation @ Receiver Band (dB)47
Minimum Transmitter to Receiver Isolation @ Transmitter Band (dB)48

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping