Qorvo ACT5102QI102-T

Qorvo ACT5102QI102-T electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
ACT5102QI102-T
Package
32-PowerVFQFN
Packaging
Tape & Reel (TR)
Description
IC REG BUCK BOOST 5V 5A 32FCQFN
Detailed Description
Buck-Boost Switching Regulator IC Positive Fixed 5V 1 Output 5A 32-PowerVFQFN
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
Qorvo
Series
ACT510x
Function
Step-Up/Step-Down
Topology
Buck-Boost
Packaging
Tape & Reel (TR)
Output Type
Fixed
Mounting Type
Surface Mount
Package / Case
32-PowerVFQFN
Current - Output
5A
Number of Outputs
1
Output Configuration
Positive
Frequency - Switching
500kHz
Operating Temperature
-40°C ~ 85°C (TA)
Synchronous Rectifier
No
Voltage - Input (Max)
23V
Voltage - Input (Min)
3.9V
Supplier Device Package
32-FCQFN (4x4)
Voltage - Output (Min/Fixed)
5V
AttributeValue
MfrQorvo
SeriesACT510x
FunctionStep-Up/Step-Down
TopologyBuck-Boost
PackagingTape & Reel (TR)
Output TypeFixed
Mounting TypeSurface Mount
Package / Case32-PowerVFQFN
Current - Output5A
Number of Outputs1
Output ConfigurationPositive
Frequency - Switching500kHz
Operating Temperature-40°C ~ 85°C (TA)
Synchronous RectifierNo
Voltage - Input (Max)23V
Voltage - Input (Min)3.9V
Supplier Device Package32-FCQFN (4x4)
Voltage - Output (Min/Fixed)5V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping