ProTek Devices MMAD1109-LF

ProTek Devices MMAD1109-LF electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
MMAD1109-LF
Package
SO
Description
ESD Suppressor Diode Array Uni-Dir 50V 14-Pin SO
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
8536.30.80.00
PPAP
No
Type
Diode Array
EU RoHS
Compliant
Mounting
Surface Mount
ECCN (US)
EAR99
Pin Count
14
Automotive
No
Lead Shape
Gull-wing
PCB changed
14
Availability
No Stock Available
Configuration
Array 7
Package Width
4(Max) mm
Direction Type
Uni-Directional
Package Height
1.5(Max) mm
Package Length
8.75(Max) mm
Supplier Package
SO
Failsafe Protection
No
Standard Package Name
SO
Manufacturer Lead Time
14 weeks
Maximum Working Voltage (V)
50
Number of Elements per Chip
7
Maximum Power Dissipation (mW)
500
Maximum Operating Temperature (°C)
150
Minimum Operating Temperature (°C)
-55
Maximum Reverse Leakage Current (uA)
0.1
AttributeValue
HTS8536.30.80.00
PPAPNo
TypeDiode Array
EU RoHSCompliant
MountingSurface Mount
ECCN (US)EAR99
Pin Count14
AutomotiveNo
Lead ShapeGull-wing
PCB changed14
AvailabilityNo Stock Available
ConfigurationArray 7
Package Width4(Max) mm
Direction TypeUni-Directional
Package Height1.5(Max) mm
Package Length8.75(Max) mm
Supplier PackageSO
Failsafe ProtectionNo
Standard Package NameSO
Manufacturer Lead Time14 weeks
Maximum Working Voltage (V)50
Number of Elements per Chip7
Maximum Power Dissipation (mW)500
Maximum Operating Temperature (°C)150
Minimum Operating Temperature (°C)-55
Maximum Reverse Leakage Current (uA)0.1

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping