Power Dynamics, Inc. PD-15-2-TR

Power Dynamics, Inc. PD-15-2-TR electronic component

Image shown is a representation only

Manufacturer No
PD-15-2-TR
Packaging
Bag
Description
NEMA 5-15R Tamper Resistant, Sna
Detailed Description
Power Connector Receptacle, Female Socket NEMA 5-15R Panel Mount, Snap-In
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Series
*
Features
Tamper Resistant
Packaging
Bag
Termination
IDC
Manufacturer
Power Dynamics, Inc.
Mounting Type
Panel Mount, Snap-In
Connector Type
Receptacle, Female Socket
Voltage Rating
125VAC
Approval Agency
cULus
Connector Style
NEMA 5-15R
Panel Thickness
0.039" ~ 0.078" (1.00mm ~ 2.00mm)
Number of Positions
1
Current Rating (Amps)
15A
Material Flammability Rating
UL94 V-2
AttributeValue
Series*
FeaturesTamper Resistant
PackagingBag
TerminationIDC
ManufacturerPower Dynamics, Inc.
Mounting TypePanel Mount, Snap-In
Connector TypeReceptacle, Female Socket
Voltage Rating125VAC
Approval AgencycULus
Connector StyleNEMA 5-15R
Panel Thickness0.039" ~ 0.078" (1.00mm ~ 2.00mm)
Number of Positions1
Current Rating (Amps)15A
Material Flammability RatingUL94 V-2

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping