onsemi LV47017P-E

onsemi LV47017P-E electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
LV47017P-E
Package
25-SSIP Exposed Pad, Formed Leads
Packaging
Tube
Description
IC AUDIO AMP AB 25-HZIP
Detailed Description
Amplifier IC 4-Channel (Quad) Class AB 25-HZIP
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Class AB
Features
Mute, Short-Circuit and Thermal Protection, Standby
Packaging
Tube
Output Type
4-Channel (Quad)
Manufacturer
onsemi
Mounting Type
Through Hole
Package / Case
25-SSIP Exposed Pad, Formed Leads
Voltage - Supply
9V ~ 16V
Base Product Number
LV470
Operating Temperature
-40°C ~ 85°C (TA)
Supplier Device Package
25-HZIP
Max Output Power x Channels @ Load
48W x 4 @ 4Ohm
AttributeValue
TypeClass AB
FeaturesMute, Short-Circuit and Thermal Protection, Standby
PackagingTube
Output Type4-Channel (Quad)
Manufactureronsemi
Mounting TypeThrough Hole
Package / Case25-SSIP Exposed Pad, Formed Leads
Voltage - Supply9V ~ 16V
Base Product NumberLV470
Operating Temperature-40°C ~ 85°C (TA)
Supplier Device Package25-HZIP
Max Output Power x Channels @ Load48W x 4 @ 4Ohm

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping