onsemi KA75290ZTA

onsemi KA75290ZTA electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
KA75290ZTA
Package
TO-226-3, TO-92-3 (TO-226AA)
Packaging
Tape & Box (TB)
Description
IC SUPERVISOR 1 CHANNEL TO92-3
Detailed Description
Supervisor Open Drain or Open Collector 1 Channel TO-92-3
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Simple Reset/Power-On Reset
Reset
Active Low
Output
Open Drain or Open Collector
Packaging
Tape & Box (TB)
Manufacturer
onsemi
Mounting Type
Through Hole
Package / Case
TO-226-3, TO-92-3 (TO-226AA)
Base Product Number
KA75290
Voltage - Threshold
2.9V
DigiKey Programmable
Not Verified
Operating Temperature
-25°C ~ 85°C (TA)
Supplier Device Package
TO-92-3
Number of Voltages Monitored
1
AttributeValue
TypeSimple Reset/Power-On Reset
ResetActive Low
OutputOpen Drain or Open Collector
PackagingTape & Box (TB)
Manufactureronsemi
Mounting TypeThrough Hole
Package / CaseTO-226-3, TO-92-3 (TO-226AA)
Base Product NumberKA75290
Voltage - Threshold2.9V
DigiKey ProgrammableNot Verified
Operating Temperature-25°C ~ 85°C (TA)
Supplier Device PackageTO-92-3
Number of Voltages Monitored1

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping