onsemi FUSB302BUCX

onsemi FUSB302BUCX electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
FUSB302BUCX
Quantity
1,685
Availability
In Stock
Package
9-UFBGA, WLCSP
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
IC USB TYPE C CTLR PROGR 9WLCSP
Detailed Description
USB Controller USB 3.1 USB Interface 9-WLCSP (1.21x1.26)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Function
Controller
Protocol
USB
Interface
USB
Packaging
Tape & Reel (TR); Cut Tape (CT)
Standards
USB 3.1
Manufacturer
onsemi
Package / Case
9-UFBGA, WLCSP
Current - Supply
25µA
Voltage - Supply
2.8V ~ 5.5V
Base Product Number
FUSB302
DigiKey Programmable
Not Verified
Operating Temperature
-40°C ~ 85°C
Supplier Device Package
9-WLCSP (1.21x1.26)
AttributeValue
FunctionController
ProtocolUSB
InterfaceUSB
PackagingTape & Reel (TR); Cut Tape (CT)
StandardsUSB 3.1
Manufactureronsemi
Package / Case9-UFBGA, WLCSP
Current - Supply25µA
Voltage - Supply2.8V ~ 5.5V
Base Product NumberFUSB302
DigiKey ProgrammableNot Verified
Operating Temperature-40°C ~ 85°C
Supplier Device Package9-WLCSP (1.21x1.26)

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping