onsemi BU508AFTBTU

onsemi BU508AFTBTU electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
BU508AFTBTU
Package
TO-3P-3 Full Pack
Packaging
Tube
Description
TRANS NPN 700V 5A TO-3PF
Detailed Description
Bipolar (BJT) Transistor NPN 700 V 5 A 60 W Through Hole TO-3PF
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
onsemi
Packaging
Tube
Power - Max
60 W
Mounting Type
Through Hole
Package / Case
TO-3P-3 Full Pack
Transistor Type
NPN
Base Product Number
BU508
Operating Temperature
150°C (TJ)
Supplier Device Package
TO-3PF
Vce Saturation (Max) @ Ib, Ic
1V @ 2A, 4.5A
Current - Collector (Ic) (Max)
5 A
Current - Collector Cutoff (Max)
1mA
DC Current Gain (hFE) (Min) @ Ic, Vce
2.25 @ 4.5A, 5V
Voltage - Collector Emitter Breakdown (Max)
700 V
AttributeValue
Mfronsemi
PackagingTube
Power - Max60 W
Mounting TypeThrough Hole
Package / CaseTO-3P-3 Full Pack
Transistor TypeNPN
Base Product NumberBU508
Operating Temperature150°C (TJ)
Supplier Device PackageTO-3PF
Vce Saturation (Max) @ Ib, Ic1V @ 2A, 4.5A
Current - Collector (Ic) (Max)5 A
Current - Collector Cutoff (Max)1mA
DC Current Gain (hFE) (Min) @ Ic, Vce2.25 @ 4.5A, 5V
Voltage - Collector Emitter Breakdown (Max)700 V

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping