Murata Electronics NCP15XM472J03RC

Murata Electronics NCP15XM472J03RC electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
NCP15XM472J03RC
Quantity
27,580
Availability
In Stock
Package
0402 (1005 Metric)
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
THERM NTC 4.7KOHM 3500K 0402
Detailed Description
NTC Thermistor 4.7k 0402 (1005 Metric)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
B25/50
3500K
B25/85
3545K
Series
NCP15
B25/100
3560K
Packaging
Tape & Reel (TR); Cut Tape (CT)
Power - Max
100 mW
Manufacturer
Murata Electronics
Package / Case
0402 (1005 Metric)
B Value Tolerance
±3%
Base Product Number
NCP15XM
Resistance Tolerance
±5%
Operating Temperature
-40°C ~ 125°C
Resistance in Ohms @ 25°C
4.7k
AttributeValue
B25/503500K
B25/853545K
SeriesNCP15
B25/1003560K
PackagingTape & Reel (TR); Cut Tape (CT)
Power - Max100 mW
ManufacturerMurata Electronics
Package / Case0402 (1005 Metric)
B Value Tolerance±3%
Base Product NumberNCP15XM
Resistance Tolerance±5%
Operating Temperature-40°C ~ 125°C
Resistance in Ohms @ 25°C4.7k

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping