Murata Electronics DMR35-DCA3-DC1-R

Murata Electronics DMR35-DCA3-DC1-R electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
DMR35-DCA3-DC1-R
Description
Panel meter Performs precision Measurements of DC Current
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
EA
PPAP
No
Type
Digital
EU RoHS
Compliant
ECCN (US)
EAR99
Automotive
No
Availability
No Stock Available
Display Type
LED
Display Digits
3.5
Product Weight (g)
65
Manufacturer Lead Time
32 weeks
Maximum Operating Supply Voltage
32VDC
Minimum Operating Supply Voltage
9VDC
Maximum Storage Temperature (°C)
70
Minimum Storage Temperature (°C)
-40
Maximum Operating Temperature (°C)
50
Maximum Operating Supply Current (mA)
500000
AttributeValue
HTSEA
PPAPNo
TypeDigital
EU RoHSCompliant
ECCN (US)EAR99
AutomotiveNo
AvailabilityNo Stock Available
Display TypeLED
Display Digits3.5
Product Weight (g)65
Manufacturer Lead Time32 weeks
Maximum Operating Supply Voltage32VDC
Minimum Operating Supply Voltage9VDC
Maximum Storage Temperature (°C)70
Minimum Storage Temperature (°C)-40
Maximum Operating Temperature (°C)50
Maximum Operating Supply Current (mA)500000

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping