Monolithic Power Systems Inc. MPQ6519GR-AEC1-Z

Monolithic Power Systems Inc. MPQ6519GR-AEC1-Z electronic component

Image shown is a representation only

Manufacturer No
MPQ6519GR-AEC1-Z
Package
19-VFQFN
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
IC CURRENT REGULATOR 2% 19QFN
Detailed Description
Current Regulator Regulator High/Low-Side 5A 19-QFN (4x4)
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Accuracy
±2%
Function
Current Regulator
Packaging
Tape & Reel (TR); Cut Tape (CT)
Manufacturer
Monolithic Power Systems Inc.
Mounting Type
Surface Mount
Package / Case
19-VFQFN
Sensing Method
High/Low-Side
Voltage - Input
3V ~ 28V
Current - Output
5A
Base Product Number
MPQ6519
Operating Temperature
-40°C ~ 125°C (TJ)
Supplier Device Package
19-QFN (4x4)
AttributeValue
Accuracy±2%
FunctionCurrent Regulator
PackagingTape & Reel (TR); Cut Tape (CT)
ManufacturerMonolithic Power Systems Inc.
Mounting TypeSurface Mount
Package / Case19-VFQFN
Sensing MethodHigh/Low-Side
Voltage - Input3V ~ 28V
Current - Output5A
Base Product NumberMPQ6519
Operating Temperature-40°C ~ 125°C (TJ)
Supplier Device Package19-QFN (4x4)

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping