Laird Technologies - Thermal Materials A16872-04

Laird Technologies - Thermal Materials A16872-04 electronic component

Image shown is a representation only

Manufacturer No
A16872-04
Packaging
Bulk
Description
TPUTTY 403 360CC CARTRIDGE
Detailed Description
Thermal Liquid Gap Filler 360cc Cartridge
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Liquid Gap Filler
Color
White
Series
Tputty™ 403
Features
Low Outgassing (ASTM E595)
Packaging
Bulk
Shelf Life
24 Months
Manufacturer
Laird Technologies - Thermal Materials
Shelf Life Start
Date of Shipment
Size / Dimension
360cc Cartridge
Base Product Number
A16872
Thermal Conductivity
2.30W/m-K
Usable Temperature Range
-49°F ~ 302°F (-45°C ~ 150°C)
Material Flammability Rating
UL94 V-0
AttributeValue
TypeLiquid Gap Filler
ColorWhite
SeriesTputty™ 403
FeaturesLow Outgassing (ASTM E595)
PackagingBulk
Shelf Life24 Months
ManufacturerLaird Technologies - Thermal Materials
Shelf Life StartDate of Shipment
Size / Dimension360cc Cartridge
Base Product NumberA16872
Thermal Conductivity2.30W/m-K
Usable Temperature Range-49°F ~ 302°F (-45°C ~ 150°C)
Material Flammability RatingUL94 V-0

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping