Laird Technologies EMI 67SLG030030050PI00

Laird Technologies EMI 67SLG030030050PI00 electronic component

Image shown is a representation only

Manufacturer No
67SLG030030050PI00
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
RFI FILM OVER FOAM PU SOLDER
Detailed Description
RFI Film Over Foam Polyurethane Foam, Tin-Copper Polyester (SN/CU) Solder
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Film Over Foam
Shape
Rectangle
Width
0.118" (3.00mm)
Height
0.118" (3.00mm)
Length
0.197" (5.00mm)
Series
SMD Grounding Metallized
Material
Polyurethane Foam, Tin-Copper Polyester (SN/CU)
Packaging
Tape & Reel (TR); Cut Tape (CT)
Manufacturer
Laird Technologies EMI
Attachment Method
Solder
Operating Temperature
-40°C ~ 70°C
AttributeValue
TypeFilm Over Foam
ShapeRectangle
Width0.118" (3.00mm)
Height0.118" (3.00mm)
Length0.197" (5.00mm)
SeriesSMD Grounding Metallized
MaterialPolyurethane Foam, Tin-Copper Polyester (SN/CU)
PackagingTape & Reel (TR); Cut Tape (CT)
ManufacturerLaird Technologies EMI
Attachment MethodSolder
Operating Temperature-40°C ~ 70°C

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping