Knitter-Switch MFP 1320

Knitter-Switch MFP 1320 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
MFP 1320
Packaging
Bag
Description
SWITCH SLIDE 15.5 MMX10.0 MM
Detailed Description
Slide Switch SP3T Through Hole
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Series
MFP
Circuit
SP3T
Packaging
Bag
Manufacturer
Knitter-Switch
Actuator Type
Standard
Mounting Type
Through Hole
Switch Travel
2.50mm
Contact Finish
Silver
Contact Timing
Shorting (MBB)
Actuator Length
4.00mm
Mechanical Life
10,000 Cycles
Operating Force
200 ~ 300gf
Switch Function
On-On-On
Contact Material
Copper Alloy
Actuator Material
Polyoxymethylene (Acetal) (POM)
Termination Style
PC Pin
Voltage Rating - DC
30 V
Current Rating (Amps)
350mA (DC)
Operating Temperature
-10°C ~ 85°C
AttributeValue
SeriesMFP
CircuitSP3T
PackagingBag
ManufacturerKnitter-Switch
Actuator TypeStandard
Mounting TypeThrough Hole
Switch Travel2.50mm
Contact FinishSilver
Contact TimingShorting (MBB)
Actuator Length4.00mm
Mechanical Life10,000 Cycles
Operating Force200 ~ 300gf
Switch FunctionOn-On-On
Contact MaterialCopper Alloy
Actuator MaterialPolyoxymethylene (Acetal) (POM)
Termination StylePC Pin
Voltage Rating - DC30 V
Current Rating (Amps)350mA (DC)
Operating Temperature-10°C ~ 85°C

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping