Honeywell GSXA46C

Honeywell GSXA46C electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
GSXA46C
Description
Switch Limit N.O./N.C. SP4T Top Roller Plunger Screw Mount Linear Conduit
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
PPAP
No
Type
Safety
EU RoHS
Compliant
Mounting
Screw Mount
ECCN (US)
EAR99
Automotive
No
Device Type
Linear
Availability
No Stock Available
Actuator Style
Top Roller Plunger
Termination Style
Conduit
Switch Configuration
N.O./N.C.
Manufacturer Lead Time
14 weeks
Mechanical Life (Cycles)
1000000
Pole Throw Configuration
SP4T
Maximum Operating Temperature (°C)
70
Minimum Operating Temperature (°C)
-40
AttributeValue
PPAPNo
TypeSafety
EU RoHSCompliant
MountingScrew Mount
ECCN (US)EAR99
AutomotiveNo
Device TypeLinear
AvailabilityNo Stock Available
Actuator StyleTop Roller Plunger
Termination StyleConduit
Switch ConfigurationN.O./N.C.
Manufacturer Lead Time14 weeks
Mechanical Life (Cycles)1000000
Pole Throw ConfigurationSP4T
Maximum Operating Temperature (°C)70
Minimum Operating Temperature (°C)-40

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping