Glenair 804-001-06M5-3PC

Glenair 804-001-06M5-3PC electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
804-001-06M5-3PC
Description
Circular Connector
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
EA
PPAP
No
Type
Circular
Gender
PL
EU RoHS
Compliant
Mounting
Cable Mount
ECCN (US)
EAR99
Automotive
No
Availability
No Stock Available
Mating Style
Threaded
Shell Material
Aluminum
Contact Plating
Gold
Number of Ports
1
Body Orientation
Straight
Contact Material
Copper Alloy
Termination Method
Crimp
Product Length (mm)
25.15
Mating Cycle (Cycles)
2000
Manufacturer Lead Time
3 weeks
Insulation Resistance (MOhm)
5000
Maximum Operating Temperature (°C)
150
Minimum Operating Temperature (°C)
-55
AttributeValue
HTSEA
PPAPNo
TypeCircular
GenderPL
EU RoHSCompliant
MountingCable Mount
ECCN (US)EAR99
AutomotiveNo
AvailabilityNo Stock Available
Mating StyleThreaded
Shell MaterialAluminum
Contact PlatingGold
Number of Ports1
Body OrientationStraight
Contact MaterialCopper Alloy
Termination MethodCrimp
Product Length (mm)25.15
Mating Cycle (Cycles)2000
Manufacturer Lead Time3 weeks
Insulation Resistance (MOhm)5000
Maximum Operating Temperature (°C)150
Minimum Operating Temperature (°C)-55

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping