EPC EPC2152

EPC EPC2152 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
EPC2152
Package
Die
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
IC HALF BRIDGE DRVR 12.5A 12LGA
Detailed Description
Half Bridge Driver DC Motors, DC-DC Converters Die
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Series
ePower™
Features
Bootstrap Circuit
Interface
PWM
Load Type
Inductive, Capacitive
Packaging
Tape & Reel (TR); Cut Tape (CT)
Applications
DC Motors, DC-DC Converters
Manufacturer
EPC
Rds On (Typ)
10mOhm LS + HS
Mounting Type
Surface Mount
Package / Case
Die
Voltage - Load
0V ~ 60V
Fault Protection
Over Voltage, UVLO
Voltage - Supply
11V ~ 13V
Output Configuration
Half Bridge
Operating Temperature
-40°C ~ 125°C (TJ)
Supplier Device Package
Die
Current - Output / Channel
15A
AttributeValue
SeriesePower™
FeaturesBootstrap Circuit
InterfacePWM
Load TypeInductive, Capacitive
PackagingTape & Reel (TR); Cut Tape (CT)
ApplicationsDC Motors, DC-DC Converters
ManufacturerEPC
Rds On (Typ)10mOhm LS + HS
Mounting TypeSurface Mount
Package / CaseDie
Voltage - Load0V ~ 60V
Fault ProtectionOver Voltage, UVLO
Voltage - Supply11V ~ 13V
Output ConfigurationHalf Bridge
Operating Temperature-40°C ~ 125°C (TJ)
Supplier Device PackageDie
Current - Output / Channel15A

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping