Eaton Tripp Lite ED355

Eaton Tripp Lite ED355 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
ED355
Description
Fuse HRC 355A 415V Bolt Down Tap 31 X 112mm
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
EA
PPAP
No
Type
HRC
EU RoHS
Compliant
Mounting
Bolt Down
ECCN (US)
EAR99
Automotive
No
Application
Motor Circuit
Availability
No Stock Available
Fuse Size (mm)
31 X 112
Termination Style
Tap
Current Rating (A)
355
Number of Terminals
2
Product Length (mm)
50
Product Diameter (mm)
38
Manufacturer Lead Time
4 weeks
Maximum Voltage Rating (V)
415
Typical Melting I2t (A²S)
360000
Maximum AC Voltage Rating (V)
415
AttributeValue
HTSEA
PPAPNo
TypeHRC
EU RoHSCompliant
MountingBolt Down
ECCN (US)EAR99
AutomotiveNo
ApplicationMotor Circuit
AvailabilityNo Stock Available
Fuse Size (mm)31 X 112
Termination StyleTap
Current Rating (A)355
Number of Terminals2
Product Length (mm)50
Product Diameter (mm)38
Manufacturer Lead Time4 weeks
Maximum Voltage Rating (V)415
Typical Melting I2t (A²S)360000
Maximum AC Voltage Rating (V)415

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Nov 20, 2026 - Nov 21, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping