Diotec Semiconductor KBPC3510FP

Diotec Semiconductor KBPC3510FP electronic component

Image shown is a representation only

Manufacturer No
KBPC3510FP
Package
4-Square, KBPC35
Packaging
Bulk
Description
BRIDGE RECT 1P 1KV 35A KBPC35
Detailed Description
Bridge Rectifier Single Phase Standard 1 kV Chassis Mount KBPC35
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Packaging
Bulk
Diode Type
Single Phase
Technology
Standard
Manufacturer
Diotec Semiconductor
Mounting Type
Chassis Mount
Package / Case
4-Square, KBPC35
Base Product Number
KBPC3510
Operating Temperature
-50°C ~ 150°C (TJ)
Supplier Device Package
KBPC35
Voltage - Peak Reverse (Max)
1 kV
Current - Reverse Leakage @ Vr
10 µA @ 1000 V
Current - Average Rectified (Io)
35 A
Voltage - Forward (Vf) (Max) @ If
1.1 V @ 17.5 A
AttributeValue
PackagingBulk
Diode TypeSingle Phase
TechnologyStandard
ManufacturerDiotec Semiconductor
Mounting TypeChassis Mount
Package / Case4-Square, KBPC35
Base Product NumberKBPC3510
Operating Temperature-50°C ~ 150°C (TJ)
Supplier Device PackageKBPC35
Voltage - Peak Reverse (Max)1 kV
Current - Reverse Leakage @ Vr10 µA @ 1000 V
Current - Average Rectified (Io)35 A
Voltage - Forward (Vf) (Max) @ If1.1 V @ 17.5 A

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping