Cyber Power Systems (USA) Inc. PDU81007

Cyber Power Systems (USA) Inc. PDU81007 electronic component

Image shown is a representation only

Manufacturer No
PDU81007
Packaging
Bulk
Description
SW MBO PDU 30A 208V Metered-by-O
Detailed Description
PDU (Power Distribution Unit) Rack, Horizontal
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
PDU (Power Distribution Unit)
Packaging
Bulk
AC Outlets
16
Cord Length
12' (3.66m)
Manufacturer
Cyber Power Systems (USA) Inc.
Current - Max
30A
Mounting Type
Rack, Horizontal
Region Utilized
International
Voltage - Input
200 ~ 240V
Overload Protection
Circuit Breaker(s)
Connector - AC Input
NEMA L6-30P
Connector - AC Output
C13 (16)
Media Lines Protected
RJ45
AttributeValue
TypePDU (Power Distribution Unit)
PackagingBulk
AC Outlets16
Cord Length12' (3.66m)
ManufacturerCyber Power Systems (USA) Inc.
Current - Max30A
Mounting TypeRack, Horizontal
Region UtilizedInternational
Voltage - Input200 ~ 240V
Overload ProtectionCircuit Breaker(s)
Connector - AC InputNEMA L6-30P
Connector - AC OutputC13 (16)
Media Lines ProtectedRJ45

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping