Broadcom Limited AFEM-9086-TR1

Broadcom Limited AFEM-9086-TR1 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
AFEM-9086-TR1
Package
50-SMD Module
Packaging
Tape & Reel (TR)
Description
PA FEM MID BAND PAD 5.5X8.2MM
Detailed Description
RF IC Amplifier, Coupler, Duplexer, Switch CDMA, DCS, GSM, LTE, PCS, TD-LTE, UMTS 1.5GHz ~ 2.2GHz, 2.3GHz ~ 2.7GHz Module
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
RF Type
CDMA, DCS, GSM, LTE, PCS, TD-LTE, UMTS
Function
Amplifier, Coupler, Duplexer, Switch
Frequency
1.5GHz ~ 2.2GHz, 2.3GHz ~ 2.7GHz
Packaging
Tape & Reel (TR)
Manufacturer
Broadcom Limited
Mounting Type
Surface Mount
Package / Case
50-SMD Module
Base Product Number
AFEM-9086
Supplier Device Package
Module
AttributeValue
RF TypeCDMA, DCS, GSM, LTE, PCS, TD-LTE, UMTS
FunctionAmplifier, Coupler, Duplexer, Switch
Frequency1.5GHz ~ 2.2GHz, 2.3GHz ~ 2.7GHz
PackagingTape & Reel (TR)
ManufacturerBroadcom Limited
Mounting TypeSurface Mount
Package / Case50-SMD Module
Base Product NumberAFEM-9086
Supplier Device PackageModule

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping