Bourns Inc. CRA2010-FZ-R020ELF

Bourns Inc. CRA2010-FZ-R020ELF electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
CRA2010-FZ-R020ELF
Package
2010 (5025 Metric)
Packaging
Tape & Reel (TR)
Description
RES 0.02 OHM 1% 1W 2010
Detailed Description
20 mOhms ±1% 1W Chip Resistor 2010 (5025 Metric) Current Sense, Moisture Resistant Metal Element
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Mfr
Bourns Inc.
Series
CRA2010
Features
Current Sense, Moisture Resistant
Packaging
Tape & Reel (TR)
Tolerance
±1%
Resistance
20 mOhms
Composition
Metal Element
Power (Watts)
1W
Package / Case
2010 (5025 Metric)
Size / Dimension
0.197" L x 0.098" W (5.00mm x 2.50mm)
Base Product Number
CRA2010
Height - Seated (Max)
0.031" (0.80mm)
Operating Temperature
-55°C ~ 170°C
Number of Terminations
2
Supplier Device Package
2010
Temperature Coefficient
±75ppm/°C
AttributeValue
MfrBourns Inc.
SeriesCRA2010
FeaturesCurrent Sense, Moisture Resistant
PackagingTape & Reel (TR)
Tolerance±1%
Resistance20 mOhms
CompositionMetal Element
Power (Watts)1W
Package / Case2010 (5025 Metric)
Size / Dimension0.197" L x 0.098" W (5.00mm x 2.50mm)
Base Product NumberCRA2010
Height - Seated (Max)0.031" (0.80mm)
Operating Temperature-55°C ~ 170°C
Number of Terminations2
Supplier Device Package2010
Temperature Coefficient±75ppm/°C

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping