ABB Electrification (Thomas and Betts) C10-10F

ABB Electrification (Thomas and Betts) C10-10F electronic component

Image shown is a representation only

Manufacturer No
C10-10F
Packaging
Bulk
Description
UNINS FORK TERM 12-10 NO10 META
Detailed Description
10 Stud Spade Terminal Connector Crimp 10-12 AWG
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Series
Sta-Kon®, Thomas & Betts
Packaging
Bulk
Insulation
Non-Insulated
Wire Gauge
10-12 AWG
Termination
Crimp
Manufacturer
ABB Electrification (Thomas and Betts)
Mounting Type
Free Hanging (In-Line)
Stud/Tab Size
10 Stud
Terminal Type
Standard
Contact Finish
Tin
Contact Material
Copper
Length - Overall
0.820" (20.83mm)
Width - Outer Edges
0.380" (9.65mm)
AttributeValue
SeriesSta-Kon®, Thomas & Betts
PackagingBulk
InsulationNon-Insulated
Wire Gauge10-12 AWG
TerminationCrimp
ManufacturerABB Electrification (Thomas and Betts)
Mounting TypeFree Hanging (In-Line)
Stud/Tab Size10 Stud
Terminal TypeStandard
Contact FinishTin
Contact MaterialCopper
Length - Overall0.820" (20.83mm)
Width - Outer Edges0.380" (9.65mm)

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 4, 2026 - Oct 5, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping